Sibley Hospital

Healthcare

Size: 211,000 SF | 2 Buildings
Services Performed: Interior Walls & Ceilings, LGMF, Insulation, Acoustic Ceilings

Project Details:

In 1998 Forrester Construction was awarded a new wing to one of the oldest hospitals in the Washington DC area. Forrester selected CJC as the drywall contractor for the project which included several specialty ceilings. The exterior light gauge steel framing was particularly difficult on this project with intricate window conditions, special deflection requirements, roof cornice framing and spandrel bypass framing at selected areas.